Roadmap

Built, next and later.

What's here today, and what we intend to build. Intentions, not promises: nothing below Built is in the product yet.

Built

Next

  • Accounts and subscriptionsSelf-service sign-up, shared team workspaces, Microsoft sign-in and billing.
  • Project historyYour updates kept per project, so trend and delay analysis builds up over time.
  • Time Impact AnalysisInsert a delay fragnet into the accepted programme and measure the finish movement: the prospective counterpart to the windows analysis.
  • Portfolio roll-upHealth, SPI(t), float and top risks across every project.

Later

  • Single sign-onSAML single sign-on with Microsoft Entra ID, for Enterprise.
  • Cost accounts and cash flowA cost breakdown independent of the WBS, commitments and cash flow with retention, and front-end loading detection.
  • Constraint log and PPCWhat blocks each look-ahead activity, and Percent Plan Complete with reasons.
  • Resource levellingResource-limited scheduling and a levelled-against-unlevelled comparison.
  • What-if scenariosNamed variants compared side by side.
  • Progress claim sheetsMarked-up progress read back and written into the XER.
  • Correlated and cost riskCorrelation between specific risks, and cost risk alongside schedule risk.
  • Other formatsMicrosoft Project XML and Asta Powerproject.